We prepare your home to safely carry an extra level by stabilising foundations with certified engineering methods.

We are Underpinning Melbourne — Structural Preservation Specialists. With 20+ years’ experience, our team provides concrete underpinning, resin injection and screw piling as neat, council‑compliant solutions.

Melbourne’s reactive soil and shifting ground cause cracks, uneven floors and structural issues. We assess your foundation to AS 2870, explain options in plain language and coordinate VBA‑compliant certification.

Resin injection fills voids and lifts slabs with minimal excavation. Our approach protects gardens, services and your property while delivering long‑term performance.

Get a fixed‑price quote today and book a free, no‑obligation structural assessment. Call Chris: 1300 970 930 or Email Chris: chris@underpinning-melbourne.com.au.

Key Takeaways

  • We stabilise foundations to allow safe additions with certified engineering.
  • Local soil and ground movement require measured, site‑specific solutions.
  • Resin injection is fast, clean and suitable where access is limited.
  • We provide clear reports, VBA compliance and fixed‑price quotes.
  • Minimal disruption methods protect gardens and services during the job.

Secure your planned second storey with Melbourne’s Structural Preservation Specialists

Secure foundations early and reduce risk; our team guides the whole process from inspection to certification.

We protect your home with clear advice and measured work. Our free, no‑obligation assessment starts with a site inspection to identify issues and map moisture and levels.

Modern resin injection often reduces excavation and speeds the job. We compare methods, outline timeframes and give a fixed‑price quote to keep your building on schedule.

Our VBA‑registered, insured team coordinates engineering reports and permits. We plan around utilities and tight access to minimise disruption and risk.

Method Access Excavation Typical Time Best Use
Resin injection Minimal Low 1–3 days Limited access, quick lifts
Concrete Moderate High 1–2 weeks Large, heavy loads
Screw piling Moderate Variable 3–7 days Deep support on reactive sites

Get in touch today. Call Chris: 1300 970 930 or Email Chris for a free assessment and fixed quote.

When a second storey triggers underpinning needs

Adding an upper level can reveal hidden weaknesses in your home’s foundation that need urgent attention.

We calm the process with clear, engineer‑led advice. Our team assesses whether extra load will expose foundation problems. We prioritise safety and permanent solutions.

Common triggers

  • Extra load from an upper level can expose hidden foundation weaknesses.
  • Wall cracks, sticky doors and uneven floors are warning signs of movement.
  • Sinking slab or twisted frames indicate active settlement.

Pre‑build assessment

We run a site inspection, levels survey and soil testing before design. Moisture mapping and drainage checks find the root cause.

Engineer‑led design and compliance

Our engineers design to AS 2870 and arrange VBA‑compliant certification. We match the method to cause and do not start until the problem is clear.

Trigger Investigation Typical result
Cracks / sticky doors Levels survey & monitoring Confirm differential movement
Soft or reactive soil Soil testing & moisture mapping Ground improvement or deep support
Slab on fill Foundation compliance check Design adjustment or replacement

We provide a concise report, clear scope and fixed‑price quote. This upfront clarity keeps your house addition safe and on schedule.

underpinning for second storey melbourne

Before your builder breaks ground upstairs, confirm whether the foundations can carry extra load. A short inspection reduces risk and keeps the project on schedule.

Do you need underpinning before adding an upper level?

Not every addition needs structural strengthening. Many Melbourne homes, though, benefit from planned foundation work due to reactive ground.

We assess your home, then advise whether strengthening is required. Our inspection includes levels checks and a soil overview so you know what the site needs.

  • We confirm if extra support is necessary.
  • We compare resin injection and concrete methods to match access and time constraints.
  • We provide a clear report that supports permit packs and builder planning.

Benefits: structural integrity, council compliance and project certainty

Planned strengthening protects your investment and reduces lifecycle risk. Minimal disruption methods are available where access is tight.

Method Excavation Typical time Best use
Resin injection Low—minimal digging 1–3 days Ground improvement, controlled lift, quick work
Concrete beam & base High—mass excavation 1–2 weeks Heavy loads, certain footing types
Screw piling Variable—machine access 3–7 days Deep support on reactive soils

Get a free quote after assessment. We supply council‑ready documents, fixed‑price quotes and VBA‑registered, insured delivery so your builder can plan with certainty.

Choosing the right underpinning method for your home

Choosing the right method early saves time, cost and worry on your project. We explain practical options in plain language. Our team matches performance to need and access.

A detailed illustration depicting various underpinning methods for residential homes, focusing on a second-storey addition. In the foreground, show a construction professional in a hard hat and safety vest, examining floor plans next to a small excavation site. The middle ground features diverse underpinning methods, such as piled underpinning, beam and base methods, and mini-piling, with visual distinctions for each technique. In the background, a suburban Melbourne neighborhood with two-storey homes, highlighting the context of renovation. The scene is set during golden hour, with warm, natural lighting casting soft shadows, evoking a sense of active construction and care in home improvement choices. Use a slightly elevated angle to capture depth and perspective. No text or watermarks included.

Concrete: mass concrete and beam‑and‑base

Concrete work suits accessible sites where founding depths are stable. Mass concrete runs $1,000–$3,000 per metre. Beam‑and‑base can be $1,500–$3,500 per metre and handles bridging weak zones.

It is robust but slower. Expect more excavation and longer time on complex sites.

Resin injection: cleaner, faster ground improvement

Resin injection uses small 16 mm holes to improve soil and lift a slab. Typical residential jobs range $4,000–$15,000.

It reduces digging, shortens the job and limits garden impact. It suits tight access and quick programme needs.

Screw piling: deep support on difficult ground

Screw piles bypass poor near‑surface soil and anchor into competent layers. Mini piles cost about $10,000–$20,000 per pile.

We weigh cost per metre or per pile against lifecycle performance, disruption and compliance. You receive a clear method statement and a tidy, safe work plan.

Method Access Typical time Cost guide
Concrete (mass) Moderate 1–2 weeks $1,000–$3,000/m
Beam & base Moderate 1–2 weeks $1,500–$3,500/m
Resin injection Minimal 1–3 days $4,000–$15,000 (residential)
Screw piling Machine access 3–7 days $10,000–$20,000/pile

Melbourne conditions that influence second storey underpinning

Reactive clay, street trees and hidden services often determine the method we choose on each site.

Reactive clays swell in wet months and shrink in dry spells. This movement causes heave and subsidence and creates foundation problems that must be designed into the fix. Tree roots near footings change moisture and alter bearing capacity.

Access, services and heritage constraints

Narrow laneways, buried pipes and congested services limit machine access and influence method choice. Poor drainage or leaking pipes wash away soil and create damage near footings. Adjacent excavation can undermine foundations if cuts go below bearing level.

How we manage risk

  • We survey the site and locate utilities before work.
  • We design to cope with seasonal ground and tree-root moisture swings.
  • We plan gentle methods for heritage homes and document each step.
  • Our team sequences work to reduce noise, dust and time on site.
  • We protect neighbours and shared boundaries throughout the program.

Local knowledge reduces surprises and keeps your property safe. Use our cost calculator to estimate likely scopes and timing.

Our calm, engineering-focused underpinning process

Our team follows a calm, engineer-led sequence that turns diagnosis into a predictable repair plan. We coordinate reports, permits and certification so the job runs on time and with minimal disruption. Your safety and the structure’s long-term performance guide every step.

Site investigation: cause, soil profile and level monitoring

We begin with a thorough site inspection to find the cause, not just the symptoms. Level monitoring establishes a baseline before any work starts.

Soil profiling and moisture checks use modern survey tools. This data sets the design and expected lift for the slab and foundations.

A professional engineer in a hard hat and safety vest conducting a site inspection for underpinning work on a second storey addition. In the foreground, the engineer examines construction plans while crouching beside foundational supports. In the middle ground, distinct underpinning equipment like steel braces and concrete piles are partially visible. The background shows a partially constructed brick building with scaffolding, reflecting a sunny Melbourne day with clear skies. The scene is well-lit, creating a calm and focused atmosphere, emphasizing the precision and engineering expertise involved in the process. The lens perspective captures both detailed tools and the broader construction site, showcasing a collaborative work environment among construction professionals.

Solution design: marked locations and service locating

Designs show marked injection points and a clear sequence of work. We GPR-scan the site to locate buried services and avoid surprises.

Plans are council-ready and include method statements, safe work steps and timing so your builder can plan their program.

Delivery and QA: installation, controlled lift and clean-up

On site we drill small 16 mm holes to the design depth and install ports for controlled resin injection. We monitor levels continuously to reach the target level gently.

After injection we regrout, tidy the slab and complete a documented quality assurance pack. The team stays available to answer questions during and after the work.

  • We diagnose the cause and map the soil.
  • We protect services with GPR before drilling.
  • We control the lift with survey gear during injection.
  • We hand over council-ready certification and reports.

Ready to start the process? Book a free inspection and fixed-price quote via our contact page. Call Chris: 1300 970 930 or Email Chris: chris@underpinning-melbourne.com.au.

Costs for underpinning in Melbourne today

Knowing typical price ranges helps you plan the project and compare quotes. We give clear, fixed-price quotes after inspection and an engineering review.

Typical ranges

Common price bands

Minor stabilisation jobs commonly run from about $4,000–$15,000. Complex repairs sit in the $15,000–$30,000+ range. Severe movement on large properties can exceed $50,000.

Method-based guide

Costs vary by chosen method and access. Typical guides are shown below.

Method Typical cost When used
Mass concrete $1,000–$3,000 per metre Accessible site, heavy loads
Beam & base concrete $1,500–$3,500 per metre Bridge weak zones, larger footprints
Resin injection / resin $4,000–$15,000 (residential) Low access, quick slab lift and injection
Mini / micro piling $10,000–$20,000 per pile Deep founding on reactive soil

What drives price

Severity, soil type, restricted access, footprint and chosen methods have the biggest impact. Hidden damage, tree roots or services can add time and cost.

  • We share ranges early so you can budget with confidence.
  • Concrete is often priced per metre; piling is per pile and depth.
  • Resin injection can reduce on-site time and disruption for many houses.
  • We provide a detailed quote after inspection and engineering review.
  • Ask us for a free quote with a clear breakdown—no upsell, just facts.

Get clarity today. Call Chris: 1300 970 930 or Email Chris: chris@underpinning-melbourne.com.au.

Why choose Underpinning Melbourne for second storey projects

You can rely on our certified team to assess foundations and deliver transparent, council‑ready reports. We combine engineering, site survey and practical delivery so your project runs smoothly.

VBA registered, insured and 20+ years’ experience. Our team gives honest assessments. If no remedial work is needed, we say so.

A detailed construction scene set in Melbourne, showcasing the process of underpinning a house for a second storey addition. In the foreground, a construction worker in professional attire is inspecting the foundation, surrounded by tools and equipment like shovels and hydraulic jacks. The middle ground features a partially excavated foundation with reinforced concrete pillars being installed, illustrating the underpinning process. In the background, iconic Melbourne architecture is visible, blending modern and historic styles, under a clear blue sky. The warm afternoon sunlight casts gentle shadows, emphasizing the project's scale and importance. The overall mood is industrious and focused, reflecting the precision required for successful underpinning projects.

Trusted credentials and clear assessments

We use engineer‑led investigation and GPR service locating to reduce risk to utilities. This keeps excavations minimal and protects services on site.

Free assessments and fixed‑price quotes

Get a no‑obligation inspection and a fixed quote after our review. Resin methods can reduce digging and let you occupy the home during work.

  • We specialise in second storey readiness across Melbourne suburbs.
  • VBA registration and insurance protect you and your project.
  • Our team provides straight advice and full‑service underpinning services and structural reporting.
  • We coordinate with your designer and builder for smooth delivery.
  • Minimal disruption methods keep your home functional during the job.
  • You receive a fixed‑price quote after inspection and assessment.
  • Our experience helps avoid delays at permit and construction stages.
  • Get in touch to book your inspection and align your programme.
  • We stand behind our work and remain available after completion.
Feature Benefit What we provide
VBA registration & insurance Compliance & peace of mind Council‑ready reports and certified delivery
Engineer‑led inspection Accurate diagnosis GPR, levels survey and soil overview
Minimal excavation methods Lower disruption Resin injection options and tight‑access plans
Fixed‑price quote Budget certainty Detailed scope after site assessment

Get in touch: Call Chris: 1300 970 930 or Email Chris: chris@underpinning-melbourne.com.au. Learn more about our approach on underpinning melbourne.

Book your assessment and get your addition underway

Secure a start window by arranging a site inspection and sending photos for rapid pre-assessment. Our team offers free, no‑obligation structural assessments to help you plan the project with confidence.

Rapid, low‑disruption methods such as resin injection can shorten the programme time and reduce on‑site impact. Clear site photos let us pre-assess access, services and likely methods before the visit.

  • Call Chris: 1300 970 930 to schedule your inspection.
  • Email site photos today to chris@underpinning-melbourne.com.au for fast advice.
  • We confirm availability and outline likely steps and timeframe for the job.
  • Our team coordinates engineering reports so your builder can lock in framing dates.
  • You receive a transparent fixed‑price quote after inspection so you can decide quickly.

Book now to secure a start window that suits your build. We keep paper work simple, give clear next steps and stay responsive through design, delivery and handover.

Call Chris on 1300 970 930 or email chris@underpinning-melbourne.com.au

Send site photos today for fast advice and engineering report coordination

Conclusion

We deliver practical foundation repairs that stop movement and restore confidence in your home. Our team pairs local experience with clear engineering to protect your property long term.

Cost‑effective solutions depend on accurate diagnosis and the right methods for your soil. Resin injection, concrete slab work and piles all have a role where conditions demand them.

Book a free assessment and get a fixed‑price quote with VBA‑compliant certification. Call Chris: 1300 970 930 or Email Chris: chris@underpinning-melbourne.com.au.

Learn how restumping and other options compare in our short guide: restumping vs underpinning. We stand ready to support your project to completion.

FAQ

Do I always need underpinning before adding an upper level?

Not always. We assess existing foundations, soil conditions and the additional load from your planned addition. If surveys, levels and an engineer’s review show the current footing can safely carry the extra weight, no major works may be required. If the assessment reveals settlement, cracking or inadequate depth, strengthening or local support is usually recommended to meet Building Code and VBA compliance.

What triggers the need for foundation works when planning a second storey?

Common triggers include cracking in masonry, uneven floors, sticky doors, visible settlement and changes in level readings. Increased load from a new storey, reactive clay soils, nearby trees and poor original footings also prompt intervention. We start with a site inspection, soil testing and level monitoring to determine cause and scope.

Which underpinning methods suit Melbourne soils best?

Choice depends on soil type and access. Mass concrete or beam-and-base suits stable sites needing broad support. Resin injection (chemical consolidation) is faster, cleaner and effective for localized voids and ground improvement. Screw piles or driven piles suit deep or very reactive ground. We design to AS 2870 and prepare council-ready plans.

What does a pre-build assessment include?

A thorough assessment includes a visual inspection, levels survey, moisture mapping and targeted soil testing. We locate services, use GPR where needed, and provide an engineer-led report with recommended solutions, timelines and an indicative cost. This report supports your builder and the permit process.

How long does the remediation process take on a typical house?

Timelines vary. Localised resin injection or a few underpinning bays can finish in days. Mass concrete or piling for larger footprints may take several weeks including curing and regrout. We provide a project schedule in your fixed-price quote so you know expected start and finish dates.

How much should I expect to pay for foundation work?

Costs depend on severity, soil type, access and method. Minor stabilisation commonly ranges from around ,000 to ,000. More complex projects involving multiple bays or piling can exceed ,000–,000. Our free, no-obligation structural assessment and fixed quote outline exact costs for your property.

Is resin injection safe and permanent?

Yes. High-density polyurethane and resin systems chemically stabilise and lift slabs by filling voids and improving bearing capacity. When installed to manufacturer and engineering specifications, they provide durable ground improvement. We select products suited to Melbourne soils and provide warranty and QA documentation.

Will underpinning disrupt my home and garden?

We minimise disruption. Resin and screw pile methods are cleaner and quicker than mass concrete. Where heavier works are required, we protect finishes, manage excavations and restore landscaping. Our teams work to site-specific plans and maintain clear communication throughout the project.

What guarantees and compliance do you provide?

We are VBA-registered and hold public liability and professional indemnity insurance. Every engineered design meets AS 2870 and local council requirements. Work is inspected and certified by a structural engineer. You receive compliance paperwork and warranties on materials and workmanship.

How do I arrange an inspection and quote?

Call Chris on 1300 970 930 or email Chris at chris@underpinning-melbourne.com.au. Send site photos and a brief description first for fast advice. We offer free, no-obligation structural assessments and fixed-price quotes tailored to your property.

Can underpinning affect my council approval or insurance?

Properly designed and certified works support council approvals and reduce insurance risks linked to structural movement. Our engineer-prepared plans and certification help satisfy council and insurer requirements. Always inform your insurer about planned structural works before you start.

How do you decide between mass concrete and screw piling?

We consider soil profile, access, footprint and surrounding structures. Mass concrete is effective for shallow, broad support. Screw piling suits deeper, constrained or very reactive sites and offers less excavation. An engineer-led site investigation and soil testing determine the optimal method for durability and cost-efficiency.
Scroll to Top