You’re here because your home shows movement or cracking and you want clear, reliable advice. We explain the real risks and the engineering steps we take to protect your building foundation and restore stability.
We are Underpinning Melbourne, Structural Preservation Specialists. With 20+ years’ experience we focus on safety, VBA compliance and certified outcomes.
Underpinning is proven, but it is construction work with inherent hazards. We control those hazards through geotechnical surveys, licensed crews and independent engineering oversight.
Melbourne’s reactive clay and changing moisture drive most foundation movement. We address root causes, maintain load paths and protect neighbouring property during every stage.
Call Chris: 1300 970 930 or Email Chris: chris@underpinning-melbourne.com.au. For an instant estimate try our cost calculator.
Key Takeaways
- We identify issues with surveys and engineering before works start.
- Licensed, insured teams follow VBA‑compliant designs for safety.
- We minimise disruption and provide fixed‑price quotes up front.
- Root causes like reactive clay are treated, not ignored.
- We coordinate reports and supply as‑built documentation for peace of mind.
Understanding underpinning in Melbourne: what “risk” really means today
If your home shows new cracks or doors that stick, the cause often lies in the ground beneath it. We explain simple signs and sensible next steps without alarm.
- Widening cracks in walls or stepped cracking in brickwork.
- Sticking doors and windows, uneven floors or gaps at skirtings.
- Sloping floors and other indicators of subsidence and movement.
Where these problems come from. Melbourne’s reactive clay shrinks in drought and swells in rain. That movement stresses the foundation and internal finishes.
High water tables, leaking services or unexpected rock and voids can also change soil bearing capacity. Excavation or altered load paths may require temporary support so the property stays stable.
| Sign | What it may mean | First action |
|---|---|---|
| Stepped brick cracks | Uneven settlement of footings | Map cracks and book an inspection |
| Sticking doors | Floor or frame movement | Measure levels and monitor |
| Sloping floors | Subsidence or soil change | Soil and moisture testing |
Not every crack means major work. Our engineer will distinguish cosmetic issues from structural ones and explain the reasons for any recommendation.
Free assessment: Call Chris: 1300 970 930 or Email Chris: chris@underpinning-melbourne.com.au.
underpinning risks
Before any excavation begins, we assess what the soil and site conditions will demand.
Geotechnical and groundwater factors can change a straightforward job into a complex one. Reactive clay, high water tables and unexpected rock or voids affect excavation, curing and final performance.
Structural issues arise when sequencing or load transfer is incorrect. Uneven settlement or overloaded new supports can cause structural damage and further cracks walls if not managed by a certified engineer.
- Weather and trees alter soil movement over time.
- Unlicensed contractors and non‑compliant methods increase the chance of council breaches and poor outcomes.
- Site hazards such as trench collapse or service strikes require engineered shoring and strict safety controls.
| Concern | What we do | Outcome |
|---|---|---|
| Hidden ground | Geotechnical testing | Accurate scope and cost |
| Execution errors | Engineer‑led sequences | Reduced structural damage |
| Tenant/neighbor impact | Planned access and monitoring | Minimal disruption |
We are VBA Registered, insured and council‑compliant. We provide transparent, fixed‑price quotes and coordinate engineering reports to limit financial exposure and protect your property.
Call Chris: 1300 970 930 or Email Chris: chris@underpinning-melbourne.com.au.
How projects stay stable: a step‑by‑step, safety‑first process
A clear, engineered sequence keeps the job steady from first survey to final report.
We begin with site investigation. Soil testing, moisture checks and baseline levels show how the foundation behaves. Crack mapping records movement so we can compare results as work proceeds.
Engineering design and certification
An engineer completes load calculations and VBA‑compliant drawings. You receive certified documents before any excavation or work starts.
Sequencing and temporary works
We stage pins and bracing to maintain load paths. Temporary works control settlement and protect the building during each phase.
Excavation controls and quality checks
Services are located and marked. Excavation uses shoring, sloping or trench boxes where required. Spoil and plant sit at least one metre from edges. Safe access is set before digging.
| Stage | Action | Verification |
|---|---|---|
| Investigation | Soil tests, levels, crack mapping | Baseline report |
| Design | Load calculations, certified drawings | VBA endorsement |
| Execution | Bracing, staged pins, controlled excavation | Daily inspections |
| Completion | Level checks, as‑built report | Final certification |
We document every step and assign a single point of contact. Call Chris: 1300 970 930 or Email Chris: chris@underpinning-melbourne.com.au.
Selecting the right underpinning method for your property
Choosing the right method for your foundation makes the difference between a short fix and a lasting repair.
Concrete works and restumping: traditional footings
Concrete pins and restumping suit heavy masonry and aged timber systems. Staged excavation and controlled pours create new bearing under the existing foundation.
Restumping and reblocking renew timber stumps and adjust levels. For more on when to choose this option see our restumping and reblocking guide.
Resin injection: fast, low‑impact ground improvement
Resin fills voids and lifts slabs with small drill points. Materials are fast‑curing and inert, so occupants face minimal downtime.
We monitor lift to protect finishes and adjacent walls from further cracks walls.
Screw piling: deep support for weak soils
Screw piles transfer loads to competent strata below soft or variable soil. They work well where access is tight and deeper support is required.
We select this type when tests show shallow soils cannot safely support the building foundation.
| Method | Best for | Access | Outcome |
|---|---|---|---|
| Concrete pins | Heavy masonry, deep footings | Moderate | Durable new bearing |
| Resin injection | Void filling, slab lift | Minimal | Quick correction, low disruption |
| Screw piling | Weak or variable soil | Tight to moderate | Deep load transfer |
We test first, then design the right method for your existing foundation and budget. Every solution is engineered, certified and fixed‑price. Call Chris: 1300 970 930 or Email Chris: chris@underpinning-melbourne.com.au.
Budget, time and insurance: planning to reduce risk and surprises
Clear planning around cost, time and insurance keeps projects smooth and predictable.
What drives cost and schedule. Soil complexity, groundwater and access affect the scope. Your chosen method and engineering or permit requirements also increase costs and time.
What drives costs
- Soil and groundwater conditions that need extra testing or treatment.
- Restricted access or specialised plant that adds labour or transport costs.
- Engineering, permits and council requirements that extend the programme.
Timeframes and disruption
Staged work and concrete curing add time. We sequence tasks to limit disruption to your property and occupants.
For rentals, we plan tenant access and short relocations to protect income and reduce vacancy issues.
Insurance, warranties and resale
Notify your insurer before work. Some policies need endorsements for foundation repairs. We provide warranties and as‑built reports to reassure buyers and valuers.
| Area | What we do | Benefit |
|---|---|---|
| Costs | Fixed‑price quotes with contingencies | Fewer budget shocks |
| Time | Programmed stages and daily checks | Less disruption |
| Insurance | Help with notifications and reports | Clear cover for the project |
We provide transparent fixed‑price quotes, realistic timeframes and coordinated engineering reports. If additional issues arise, we explain options and costs before we proceed. Ask for a free assessment and a written program. Call Chris: 1300 970 930 or Email Chris: chris@underpinning-melbourne.com.au.
Why choose Underpinning Melbourne for safe, compliant foundation repairs
When your property shows signs of movement, you need a contractor who puts engineering first.
Our engineering‑led approach: 20+ years, VBA registered, council‑compliant methods
We lead with certified design and licensed crews. Our team holds VBA registration and carries full insurance.
Engineers certify load calculations and staged sequences before construction starts.
Independent oversight and monitoring protect your building during every phase. We follow council rules and permit processes to avoid delays or legal problems.
Transparent offer and next steps: free assessment, fixed‑price quotes, reports and bookings
Our promise: a no‑obligation free assessment, a fixed‑price quote and coordinated structural reports. You get a clear scope and a single point of contact from booking to handover.
- One contractor delivering integrated solutions: repair, restumping, resin injection and screw piling.
- Site safety, service location and daily checks are standard practice.
- We provide as‑built reports to support insurers and future buyers.
| Feature | What we do | Benefit |
|---|---|---|
| Engineering | Certified designs and independent checks | Safe, compliant construction |
| Pricing | Fixed‑price quotes with clear scope | No unexpected costs |
| Project care | Monitoring and daily inspections | Minimal disruption to your home |
Book your free assessment today. Contact us — Call Chris: 1300 970 930 or Email Chris: chris@underpinning-melbourne.com.au.
Conclusion
We deliver certified, long‑term fixes that return stability to your property.
Successful outcomes start with clear soil assessment and engineered design. We control movement through staged work and safe excavation.
Your home’s structural integrity improves when causes such as subsidence and moisture change are treated, not ignored. Expect a clear plan for cracks in walls and uneven floors, with benchmarks and verification over time.
Documentation matters: you receive certified drawings, as‑built reports and full verification to reduce future damage and support buyers.
Start with a free assessment or try our wall crack diagnosis. Call Chris: 1300 970 930 or Email Chris: chris@underpinning-melbourne.com.au.
